Market · the United States

Metal Fire-Rated Door for the United States

The Metal Fire-Rated Door is configured here for the United States. The figures below are the published catalogue specification of the series; the market section covers what projects in the United States add to it. Send the opening schedule and the glazing you want, and the quotation comes back with the dimensional pack.

Blue double-leaf steel fire exit door with a full-width panic bar on a service wall, design rendering

Metal Fire-Rated Door · the USA

Metal Fire-Rated Door

The metal line pairs a steel leaf and panic bar with knock-down or welded frames, marked at 20, 45, 60 and 90 minutes. The complete configuration, glass options and finish list are on the door series page.

Door type
Metal fire exit door with panic bar · steel frame with a wooden leaf
Fire rating
20 / 45 / 60 / 90 min, catalogue test labels
Leaf
Steel leaf, powder-coat finish quoted to order
Frame
Knock-down frame · welded frame, per catalogue drawings
Frame sections
Standard knock-down · knock-down drywall · face welded · full-profile welded
Face properties
Fire resistant · impact resistant · erosion resistant
Ironmongery
Panic bar · hinge · closer · lockset · kick plate · latch · door bottom · fireproof strip
Certification
AS 1905.1:2015 · AS 1530.4:2014 · EN 1634-1:2014+A1:2018 · CAN/ULCS104 · UL Listed
Application
Plant rooms · stairwells · service cores · education · hospital

METAL FIRE-RATED DOOR · 01
METAL FIRE-RATED DOOR · 02

Engineering

Metal leaf with a panic barThe metal leaf is a steel panel finished by powder coat, hung with a full-width panic bar so a crowd can clear the opening on the way out.

Steel frame with a wooden leafOne build keeps the steel frame and takes a wooden leaf, in the same laminate, HPL and veneer faces as the timber range.

Knock-down or welded frameFrames ship either flat for site assembly or welded as one piece, in the sections the catalogue draws.

Accredited fire certificationThe catalogue lists AS 1905.1:2015, AS 1530.4:2014, EN 1634-1:2014+A1:2018 and CAN/ULCS104, with UL listing and the Intertek, CE, BS, IAS, FSC and HKAS marks.

What US projects require

Glazing rules tighten in the high-velocity hurricane zones: the code requires impact-rated glazing and defined structural performance on the exterior envelope, and most spec writers work from the ASTM and Florida building code framework as the reference point. In practice the glazing build-up, the frame section and the hardware have to be stated on the quotation, line by line, against your zone and wind-borne debris category.

Adam Alux does not hold US test certifications. The bridge is the specification process: send the zone, the debris category and the opening schedule, and the glazing build-up, frame section and hardware layout come back confirmed against that project at quotation, with a finished test unit available before production.

Shipping to US ports

Modules ship in export-standard containers sized around the opening: glazed units travel upright with corner and edge protection for the trans-Pacific line. The loading plan, including modules per container for your mix, comes with the quotation, because it depends on frame depth and glass build-up rather than a fixed table.

Freight and port handling are confirmed per shipment, and transit time is quoted at order. Packing list and conformity documentation travel with the container.

FAQ

Frequently asked

Do your aluminium windows and doors ship to the USA?

Yes. The range ships to US ports in export-standard containers, and the loading plan for your opening mix is included with the quotation.

How is hurricane-zone glazing handled on a quotation?

The glazing build-up for a designated zone is confirmed line by line against your debris category at quotation. A finished test unit is available before production.

What is the metal fire-rated door?

It is a steel fire door for industrial and public openings, built either as a metal leaf with a panic bar or as a steel frame with a wooden leaf, marked at 20, 45, 60 and 90 minutes.

Which fire ratings are available?

The catalogue marks the line at 20, 45, 60 and 90 minutes. Values are catalogue fire ratings, quoted against the opening and the wall type.

Send your opening schedule

Series, glazing and finish come back as one quotation for the United States, with the full dimensional pack on PDF and CAD on request.